Building Materials & Real Estate

CField-built Croydon council housing wins RIBA Stirling Prize 2026

A 157-home scheme in Coulsdon designed by Mary Duggan Architects and RUFF Architects has taken the 2026 RIBA Stirling Prize.

Maren KjellbergOctober 18, 20265 min read13 views
Concept illustration of a five-block council housing neighbourhood stepping across a sloping site, with landscaped paths and parkland beyond.

Lion Green Road, a 157-home council housing scheme in Coulsdon, south London, has been awarded the RIBA Stirling Prize 2026. The development was designed by Mary Duggan Architects with RUFF Architects and built for Croydon Council by main contractor CField Construction under a £34m deal.

The scheme replaces a former car park and comprises five blocks. Its sloping site varies in height by eight metres, a constraint that shaped the arrangement of homes, routes and views. The development also creates a new connection between Lion Green Road and the green parkland beyond.

Housing at scale

The 157 homes are intended for 635 residents. A consistent specification is paired with subtle changes in height and orientation across the five blocks. According to the jury, this approach offers housing at scale without uniformity.

The design is described as a “living landscape” because it uses the site’s changing levels and views. It aims to create a new garden neighbourhood that balances privacy and generous views with a strong connection to nature.

Jury citation

Chris Williamson, RIBA President, speaking on behalf of the Stirling Prize jury, said the project shows that density can be achieved without compromising the quality of the places created. He said the architects had produced a new kind of garden neighbourhood, with privacy and views balanced by a close relationship to nature.

The jury’s comments also point to the scheme’s consistent specification and the variation in height and orientation across the blocks. Those moves are presented as a way to give the development a coherent identity while avoiding a repetitive appearance.

Williamson added that the scheme demonstrated how even the most challenging sites could be transformed into distinctive places for people to call home. His comments link the award to the urgent need to deliver more homes while maintaining the quality of new neighbourhoods.

Construction and carbon

The project team credits efficient construction methods, simple finishes and a more streamlined building process with reducing carbon emissions. The scheme therefore combines council housing delivery with an attempt to limit the environmental impact of construction.

The RIBA Stirling Prize 2026 recognition highlights a completed council housing development that addresses housing numbers, a steep former car park site and landscape integration within one project.